After using two scoring systems, one with the main points addressed in my PDS and one with those same points plus the additions of lower cost, lower manufacture cost, feasibility of prototype and the option for purchasing additions for the game, I narrowed down the highest scorers in both categories. I narrowed the final three down to those who scored high in both and were close on both scores.
|
|